PART NUMBERS. CLEAR ANSWERS.
Hydraulic Parts
Start your part number search with the complete reference. Select the equipment brand to narrow the results. Check the listed name and model, then request availability and a quote. Use Prefix when you only know the first characters.
Smart search ranks exact numbers first, followed by format, prefix, contains and English product name matches. Digits are never corrected. Use at least 3 characters for broader results. Check the equipment brand and original number before ordering.
| Part number | Product name | Equipment | Actions |
|---|---|---|---|
| 803004058 | RELIEF VALVE | XCMG LW1200KN | |
| 803004100 | CHECK VALVE | XCMG ZL50GN | |
| 803004130 | ACCELERATOR CONTROL VALVE | XCMG ZL50GN | |
| 803004341 | BUCKET CYLINDER | XCMG ZL50GN | |
| 803004538 | RELIEF VALVE | XCMG LW900KN | |
| 803007456 | Oil Box Cover Lock | XCMG XE1250 | |
| 803009116 | Bushing | XCMG XE1250 | |
| 803070572 | Left Pilot control lever | XCMG XE1250 | |
| 803070573 | Right Pilot control lever | XCMG XE1250 | |
| 803074939 | PUMP | XCMG LW900KN | |
| 803075660 | BUCKET CYLINDER | XCMG LW900KN | |
| 803075661 | LEFT BOOM CYLINDER | XCMG LW900KN | |
| 803075662 | RIGHT BOOM CYLINDER | XCMG LW900KN | |
| 803077599 | Swing motor Flushing Oil return Back pressure Check valve | XCMG XE1250 | |
| 803078309 | LEFT BOOM CYLINDER | XCMG ZL50GN | |
| 803078310 | RIGHT BOOM CYLINDER | XCMG ZL50GN | |
| 803079138 | PILOT VALVE GROUP | XCMG LW900KN | |
| 803079473 | Fitting | XCMG XE1250 | |
| 803080546 | OPERATING HANDLE (EXCLUDING PILOT VALVE BODY) | XCMG LW900KN | |
| 803081856 | PILOT VALVE | XCMG LW900KN | |
| 803090251 | SINGLE JOYSTICK PILOT VALVE | XCMG ZL50GN | |
| 803090252 | PILOT VALVE | XCMG ZL50GN | |
| 803091002 | Countersunk bolt (490) | XCMG XE1250 | |
| 803091061 | Three-row roller internal gear slewing bearing | XCMG XE1250 |
Check the part number, specification and equipment details before ordering. A catalogue record is not a live stock promise. TOKOT will confirm availability, supply type and lead time with your quotation.
